Dosan Energy
ENAR

Services · MEP services

MEP contracting with an engineering mindset

Integrated mechanical, electrical and plumbing works — from airport terminals to factories — delivered by a Riyadh-based team with in-house design and estimation.

End-to-end estimation, engineering, procurement, installation, commissioning
Airports to factories KAIA Jeddah, Almarai Al Kharj, retail chains
In-house technical office, QA/QC and after-sales

The problem

A single responsible contractor.

Dosan Energy executes mechanical, electrical and plumbing works as a single responsible contractor — HVAC systems, chilled water and DX plant, ductwork, plumbing and drainage networks, water supply, firefighting systems and associated electrical works.

The solution

Everything under one roof.

Our references include the complete HVAC package for the new baggage transfer hub at King Abdulaziz International Airport (KAIA), HVAC and plumbing execution at KAIA's Certified Baggage Centre and full mechanical systems for ACIS at the same airport, alongside dozens of retrofit and fit-out projects for Almarai, eXtra and others.

Tendering and estimation, engineering, procurement, QA/QC, installation and commissioning sit under one roof, so scope changes are absorbed without finger-pointing.

HVAC ductwork installed by Dosan Energy at KAIA, Jeddah

How it works

How we deliver it

  1. STEP 01 Estimate & plan BOQ pricing, value engineering and method statements.
  2. STEP 02 Execute Site teams with QHSE supervision, shop drawings, submittals and approvals.
  3. STEP 03 Commission & hand over T&C, as-built documentation, O&M manuals, AMC options.

Applications

Who it is for

Main contractors and developers Facility owners (retrofit and fit-out) Industrial and food production Retail chains Government and education

FAQ

Questions engineers ask us.

Both. We deliver full MEP packages and stand-alone HVAC or plumbing/firefighting scopes.

Yes — references in Jeddah, Taif, Al Kharj, Majmaa, Dawadmi and the Eastern Province.

Related projects

Where we have done this

All projects
Baggage Transfer Hub — King Abdulaziz International Airport, Jeddah MATARAT / KAIA · JeddahMEP Baggage Transfer Hub — King Abdulaziz International Airport, Jeddah Complete HVAC works for the new 3,000 m² baggage transfer hub — VRF climate control, ductwork and life-safety networks — executed airside under airport security and safety protocols. Certified Baggage Centre — King Abdulaziz International Airport, Jeddah MATARAT / Hajj & Umrah Terminal · JeddahMEP Certified Baggage Centre — King Abdulaziz International Airport, Jeddah Turnkey MEP for the 3,000 m² Certified Baggage Centre at the Hajj and Umrah Terminal — VRF HVAC, plumbing and firefighting integrated with the airport's central utility networks. ACIS — King Abdulaziz International Airport, Jeddah ACIS · JeddahMEP ACIS — King Abdulaziz International Airport, Jeddah Full MEP engineering for the 1,000 m² ACIS facility: inverter-driven HVAC, drainage and stormwater networks, water supply and comprehensive fire protection.

Send us your BOQ or drawings

One conversation is usually enough to tell you whether this fits your building — and what it would save.

Ready to cut your cooling cost?

Tell us about your building. A Dosan Energy engineer will come back within one working day with the right next step.