The problem
[Content pending verification — from the Engineering & Design page] Capital cost, running cost and comfort trade-offs are decided at design stage, across IDEC, VRF, DX and chilled water options.
The solution
[Content pending verification] HVAC and MEP design, load calculations, equipment selection, energy studies, LEED studies, shop drawings and technical submittals — produced in AutoCAD, Revit, HAP, psychrometric tools and manufacturer selection software.
How it works
Applications
FAQ