Dosan Energy
ENAR

DAMAC · EDGNEX · Riyadh

DAMAC EDGNEX Data Center — Riyadh · Day 1

First phase of the EDGNEX programme: PreCooll adiabatic pre-cooling on the air-cooled chiller plant — 35% energy reduction, 650 kW peak demand cut, 1,650 t CO₂/year.

PreCooll wet wall around air-cooled chillers at DAMAC EDGNEX data center
35% energy reduction
650 kW peak demand cut
1,650 t CO₂ per year

First phase of the EDGNEX programme: PreCooll adiabatic pre-cooling on the air-cooled chiller plant — 35% energy reduction, 650 kW peak demand cut, 1,650 t CO₂/year.

Ready to cut your cooling cost?

Tell us about your building. A Dosan Energy engineer will come back within one working day with the right next step.