79ba976f-823c-4208-8c0e-7f9d2d893ecd.jpg79ba976f-823c-4208-8c0e-7f9d2d893ecd.jpg
IMG_20240202_164915.jpgIMG_20240202_164915.jpg
IMG_20240203_101945.jpgIMG_20240203_101945.jpg
IMG_20240205_161038.jpgIMG_20240205_161038.jpg
IMG_20240310_144812.jpgIMG_20240310_144812.jpg
IMG_20240218_092101.jpgIMG_20240218_092101.jpg
IMG_20240312_000942.jpgIMG_20240312_000942.jpg
IMG_20240208_093148.jpgIMG_20240208_093148.jpg
IMG_20240322_022525.jpgIMG_20240322_022525.jpg
IMG_20240403_235953.jpgIMG_20240403_235953.jpg
IMG_20240408_014243.jpgIMG_20240408_014243.jpg
IMG_20240324_024455.jpgIMG_20240324_024455.jpg
IMG_20240408_214903.jpgIMG_20240408_214903.jpg
IMG_20240416_163603.jpgIMG_20240416_163603.jpg
IMG_20240408_214911.jpgIMG_20240408_214911.jpg
IMG_20240410_030459.jpgIMG_20240410_030459.jpg
IMG_20240416_164105.jpgIMG_20240416_164105.jpg
IMG_20240421_082512.jpgIMG_20240421_082512.jpg
IMG_20240416_164041.jpgIMG_20240416_164041.jpg
IMG_20240512_012746.jpgIMG_20240512_012746.jpg
IMG_20240425_135119.jpgIMG_20240425_135119.jpg
IMG_20240515_184522.jpgIMG_20240515_184522.jpg
IMG_20240512_012751.jpgIMG_20240512_012751.jpg
IMG_20240516_172102.jpgIMG_20240516_172102.jpg
IMG_20240516_172109.jpgIMG_20240516_172109.jpg
IMG_20240623_132749.jpgIMG_20240623_132749.jpg
IMG_20240720_121940.jpgIMG_20240720_121940.jpg
WhatsApp Image 2025-02-13 at 20.08.57.jpegWhatsApp Image 2025-02-13 at 20.08.57.jpeg
IMG_20240720_122627.jpgIMG_20240720_122627.jpg
Mark if have NDANO
Status of projectProcessing
Volume / Area--
Project TypeOther

The project at King Abdulaziz International Airport’s Hajj and Umrah Terminal, we successfully executed the complete HVAC and plumbing installations.

• HVAC System: We installed a VRF system consisting of six outdoor units and 41 indoor units, along with seven package units serving the main hall. The scope also included full ductwork installation, 14 split units, and a complete exhaust and fresh air system for the building.


• Plumbing System: Our work covered the installation of the entire drainage system, including connections to the airport’s main network, a dedicated stormwater drainage system, and a comprehensive water supply network for the building.

• Firefighting System: Our work covered the installation of the entire firefighting system, including connections to the airport’s main network and providing the server room with a suitable clean agent for fire safety protection.

This large-scale project, covering approximately 3,000 square meters, presented unique challenges, but we successfully completed it within the designated timeline, ensuring exceptional quality and adherence to the highest industry standards.

•Type of Service:
Design of all MEP System including an advanced Power Smart VRF System Mechanical - HVAC, Plumbing & Firefighting

•Technologies Deployed:
Smart Saving VRF System