1000000838.jpg1000000838.jpg
1000000839.jpg1000000839.jpg
1000000840.jpg1000000840.jpg
1000000842.jpg1000000842.jpg
1000001032.jpg1000001032.jpg
1000001033.jpg1000001033.jpg
1000001234.jpg1000001234.jpg
1000001235.jpg1000001235.jpg
1000001299.jpg1000001299.jpg
1000001301.jpg1000001301.jpg
IMG_9313.jpgIMG_9313.jpg
IMG_9312.jpgIMG_9312.jpg
Mark if have NDANO
Status of projectProcessing
Volume / Area--
Project TypeOther

In this project, we successfully replaced the outdated DX units with 2 Oxycom Intrcooll Plus units in the Transport Office building, which spans approximately 620 square meters. The scope of work included the installation and integration of ductwork, water supply systems, power supply connections, and control system configurations.

This system upgrade significantly improved energy efficiency while enhancing indoor air quality. The optimized cooling solution ensures a hygienic and comfortable working environment for employees, achieving substantial power savings compared to the previous DX units.


Type of Service:
Supply and installation of Oxycom intrcooll system as arepalcement of exsisitng PACUs complete with EC exhaust fan .


Technologies Deployed:
Oxycom Intrcooll technology - EC Exhaust fans for humiditiy control intigerated with Intrcooll units