IMG_20241007_161328.jpgIMG_20241007_161328.jpg
IMG_20241007_161300.jpgIMG_20241007_161300.jpg
IMG_20241024_125325.jpgIMG_20241024_125325.jpg
IMG_20241203_120330.jpgIMG_20241203_120330.jpg
IMG_20241203_120441.jpgIMG_20241203_120441.jpg
IMG_20241203_120522.jpgIMG_20241203_120522.jpg
IMG_20241127_123517.jpgIMG_20241127_123517.jpg
IMG_20241231_150117.jpgIMG_20241231_150117.jpg
IMG_20241231_150145.jpgIMG_20241231_150145.jpg
IMG_20241231_150205.jpgIMG_20241231_150205.jpg
IMG_20241231_150226.jpgIMG_20241231_150226.jpg
IMG_20241231_150156.jpgIMG_20241231_150156.jpg
IMG_20241231_150242.jpgIMG_20241231_150242.jpg
IMG_20250107_104125.jpgIMG_20250107_104125.jpg
TimePhoto_20241008_153904.jpgTimePhoto_20241008_153904.jpg
IMG_20250107_100055.jpgIMG_20250107_100055.jpg
TimePhoto_20241008_153923.jpgTimePhoto_20241008_153923.jpg
TimePhoto_20241008_153913.jpgTimePhoto_20241008_153913.jpg
TimePhoto_20241024_151719.jpgTimePhoto_20241024_151719.jpg
TimePhoto_20241103_162755.jpgTimePhoto_20241103_162755.jpg
TimePhoto_20241104_113157.jpgTimePhoto_20241104_113157.jpg
TimePhoto_20241029_104421.jpgTimePhoto_20241029_104421.jpg
TimePhoto_20241008_153933.jpgTimePhoto_20241008_153933.jpg
TimePhoto_20241107_162404.jpgTimePhoto_20241107_162404.jpg
TimePhoto_20250101_113601.jpgTimePhoto_20250101_113601.jpg
TimePhoto_20250108_120305.jpgTimePhoto_20250108_120305.jpg
TimePhoto_20250127_102626.jpgTimePhoto_20250127_102626.jpg
TimePhoto_20241228_123822.jpgTimePhoto_20241228_123822.jpg
TimePhoto_20250112_150126.jpgTimePhoto_20250112_150126.jpg
Mark if have NDANO
Status of projectProcessing
Volume / Area--
Project TypeOther

AT ACIS We have successfully completed the installation of all mechanical systems for the ACIS project at King Abdulaziz International Airport. The scope of work encompassed the full implementation of the HVAC system, internal and external drainage networks, integration of the drainage system with the airport’s main infrastructure, water supply connections from the airport network to the entire building, stormwater drainage, and a comprehensive fire protection system.

The project covered a total area of 1,000 square meters and was executed within the designated timeline. We are proud to have delivered this project in full compliance with the highest industry standards, ensuring optimal quality and performance

Type of Service:
Design of all MEP System HVAC, Plumbing & Firefighting

Technologies Deployed:
Traditional system with inverter technology at HVAC scope.